Sainsburys RRU, Dartford
Energy & Waste Recycling and waste handling facility Role: Full architectural service Client: Sainsburys Size: 1,626m² / 17,500 ft² Location:Dartford, UK
Energy & Waste Recycling and waste handling facility Role: Full architectural service Client: Sainsburys Size: 1,626m² / 17,500 ft² Location:Dartford, UK
Energy & Waste Bespoke Design Wood Drying and 10MW CHP Biomass Plant for Stobart Role: Full architectural service Client: Stobart Size: 38,765m² / 417,250 ft² Location: Widnes, UK
Energy & Waste Bespoke medical waste Incinerator with racked Eurobin storage and wash facilities located to the South-East of Loch Leven on a former open cast mine site. Role: Full architectural service Client: Fornax Environmental Solutions Size: 7,000m² / 75,350ft² Location:Fife, Scotland
Energy & Waste Bespoke medical waste Incinerator with racked Eurobin storage and wash facilities located 3 miles South of Newton Aycliffe town centre with direct access to the A1. The Newton Aycliffe site will be the first of 5 medical waste incinerators planned nationwide. Heat generated by the incineration process will be used to distribute …
Manufacturing Bespoke manufacturing facilities for PT Crown Beverage Can Manufacturing, Cork, Ireland. Ashton Smith were involved in producing Blueprint Designs and Masterplans for various sites throughout Indonesia, Cambodia and Mexico. Each facility included various machine lines for aluminium can forming and brand printing machinery. Role: Master Planning and Concept Design Client: Crown Size: 15,000m² / …
Manufacturing Wind Turbine Monopile Manufacturing Facilities, purpose built, currently on site. Over 1m ft². Additional on-site facilities, include standalone high specification head offices, dedicated power station and plantrooms, staff welfare facilities and supporting maintenance buildings. Role: Full architectural service Client: SeAH Size: 93,000 m² / 1,000,000 ft² Location:Middlesbrough, United Kingdom
Manufacturing Ceramics and Brassware Manufacturing Facility. This end-user project includes a heavily process driven cat B fit-out, including semi and fully automated machinery, complex floor slab detailing to incorporate floor gullies, channels, trenches, pits and plinths. Role: Full architectural service Client: Undisclosed Size: 37,200m² / 400,000 ft² Location: United Kingdom
Logistics 100 acre Logistics Park with over 134,500 sq m / 1,450,000 sq ft of multi temperature warehouse space, truck terminal and labour accommodation for 4000 people Role: Master Planning and Concept Design Client: Milaha Location:Doha, Qatar
Logistics Multi storey logistics centre, South Korea. 7 level multi storey ambient logistics and distribution centre for multi occupiers. Role: Master Planning and Concept Design Client: Kendall Square Size:214,750m² / 2,311,570ft² Location:Bucheon, South Korea default
Logistics Multi storey flexible use (light industrial, SME flatted factory) development for multiple occupancy. Role: Master Planning, Concept and Detailed Design Client: BeFirst Size:10,000m² / 107,640ft² Location:Barking, UK