Greencore, Northampton
Food Processing
New build multi-level facility. High care factory with 4 segregated sandwich assembly lines.
Set out over 4 levels, this allows personnel, ingredients and packaging to be segregated and dropped down to the point of use on line.
Waste is segregated via a centrally located basement corridor spine with automation.
Role:
Full architectural service
Client:
Greencore
Size:
16,671m² / 179,453ft²
Location:
Northampton, UK
Northampton, UK